Q9. With reference to the paralleling of A.C. generators:
(a) Outline the requirements of synchronisation; (3)
(b) Explain how KW power is shared; (1)
(c) Explain how Kvar power is shared; (1)
d) list the features that the Automatic Power Management System Controls for the operation of main switchboards and generators when the engine room is in unattended mode. (5)
Q9. With reference to main A.C. generators:
a) state the immediate and subsequent actions to be taken in the event of a high windings temperature alarm being activated. (8)
b) state the feature of the windings cooler tubes that prevent damage to the windings in the event of leakage. (2)