Q8. Following bunkering operations, it is discovered that the vessel received a quantity which was short of what was stipulated in the pre-delivery document.
As Chief Engineer Officer, write a Note of Protest to the Master of the bunkering vessel. (10)
Q8. a) With reference to bunkering fuel oil, list the information to be supplied to the port authorities prior to commencement of bunker operations. (5)
b) With reference to the tank being filled, state the factors that govern the bunker loading rate. (4)
c) State a possible effect of a high bunker loading rate. (1)
Username or email address *Required
Password *Required
Note: Entering wrong username in the login form will ban your IP address immediately. Entering wrong password multiple times will also ban your IP address temporarily.
Log in
Lost your password? Remember me
No account yet?