+447452298969
Mon-Sat / 1000-1800
  • Track Order
  • Contact Us
DieselShip UK
DieselShip Logo
DieselShip Logo
Solutions for Digital Seas
  • UK – CoC Exam Guides
    • EK General & Motor (Mgmt Level)
    • EOOW Exam Guides
    • Academics subjects (Mgmt Level)
  • CoC Question Bank
    • Subjects
    • Year/Month Sets
    • Topics
    • Downloads
  • Marine Articles
    • MEK-General
      • Ballast system
      • Boilers
      • Deck Machinery
      • Dry-Docking
      • Material Science
      • Shafting & Propeller
      • Steering gear
    • Fire safety
    • Management
      • SHIP SURVEY
      • Maritime codes & Conventions
        • Statutory Requirements
        • MARPOL
        • ISM
        • ISPS Code
    • LIFE-SAVING APPLIANCES
    • Marine Electro Technology
    • MEK – Motor
      • Lube & Fuel oil
      • Main Engine
    • Repair & Fabrication
    • Ship construction & Naval Arch
  • Ship Services
    • Project Management- Dry Docking and Repairs
    • Marine CAD Services
    • Ship Chandlery, Procurement & Services
    • Marine IT Services
  • Marine Uniform & Accessories
Search
Login / Register
0 items £ 0.00
Get In Touch
Menu
DieselShip UK
DieselShip Logo
DieselShip Logo
Solutions for Digital Seas
0 items £ 0.00

DieselShip's Online Content Library

Subscription based access to past question papers and solved answers

Sorted topic & Year / Month wise

Buy a Subscription Plan
Question Topic: Compressed Air System
    This category can only be viewed by members.
  • Q7. With reference to air receivers:

    (a) explain why air receivers are prone to corrosion; (3)

    (b) state how corrosion can be prevented; (3)

    (c) if significant corrosion is detected during a regular inspection explain how the air receiver may still be safely used in service until a permanent repair can be effected. (4)

    • 2018/JUL/07
    • 2022/OCT/01
    • 2025/JUL/07
    • EK-General
    • EK-General : EKG-Section A
    View Answer
  • Q5. (a) Describe the procedure for entry into, and inspection of, the inside of a starting air receiver, stating the types of defects which may be present with their possible causes. (12)

    (b) Describe the procedure of closing up the air receiver and the initial pressurisation to working pressure. (4)

    • 2023/JUL/05
    • 2024/JUL/05
    • EK-Motor
    View Answer

DieselShip
DieselShip UK

Already ordered a product?

Track Your Order

Issues, Queries, Need Help?

Contact Helpdesk

DieselShip© 2026 DieselShip UK

  • Terms and Conditions
  • Privacy Policy
  • Product Policies
  • About Us
  • UK – CoC Exam Guides
    • Back
    • EK General & Motor (Mgmt Level)
    • EOOW Exam Guides
    • Academics subjects (Mgmt Level)
  • CoC Question Bank
    • Back
    • Subjects
    • Year/Month Sets
    • Topics
    • Downloads
  • Marine Articles
    • Back
    • MEK-General
      • Back
      • Ballast system
      • Boilers
      • Deck Machinery
      • Dry-Docking
      • Material Science
      • Shafting & Propeller
      • Steering gear
    • Fire safety
    • Management
      • Back
      • SHIP SURVEY
      • Maritime codes & Conventions
        • Back
        • Statutory Requirements
        • MARPOL
        • ISM
        • ISPS Code
    • LIFE-SAVING APPLIANCES
    • Marine Electro Technology
    • MEK – Motor
      • Back
      • Lube & Fuel oil
      • Main Engine
    • Repair & Fabrication
    • Ship construction & Naval Arch
  • Ship Services
    • Back
    • Project Management- Dry Docking and Repairs
    • Marine CAD Services
    • Ship Chandlery, Procurement & Services
    • Marine IT Services
  • Marine Uniform & Accessories
  • Track Order
  • Contact Us
WhatsApp Telegram FB Messenger
Mon-Sat / 1000-1800
  • Terms and Conditions
  • Privacy Policy
  • Product Policies
  • About Us

Follow us on Social Media

Shopping cart
Close
Sign in
Close

Note: Entering wrong username in the login form will ban your IP address immediately. Entering wrong password multiple times will also ban your IP address temporarily.

Lost your password?

No account yet?

Create an Account
Sidebar
Menu
Articles
My account
Shop
0 items Cart
Your amount to pay has been updated
The previous conversion quote has expired. Here is your new quote:
Total
$
You Pay
Back to checkout
Place Order