Q14. As Chief Engineer officer, write a dry dock specification for the repair of the following damage that has occurred, stating what factors have to be considered when costing the repairs. Damage to water ballast tank number 1 port wing. The shell plating 15 mm thick for approx 2 metres square has to be removed and replaced along with the relevant damaged stiffeners. (10)