Q9. With reference to a waste heat boiler/economiser:
a. Write a procedure for the cleaning the gas side of an exhaust gas boiler/economiser when the
associated main engine is:
(I) running; (5) (ii) stopped. (5)
b. Write a procedure for operation of the main engine when the associated waste heat boiler/economiser cannot be operated due to tube failure. (6)