Q9. (a) As an Engineer Manager write standing instructions for the in-service cleaning is the gas side of a waste heat recovery steam generator unit. (8)
(b) As the Engineer Manager write standing instruction for the action to be taken in the
event of an uptake fire in the waste heat recovery steam generating unit and action to
be taken to enable operation of the engine after the fire has been extinguished if there
is a leak in the tube nest and no exhaust gas bypass is fitted. (8)
Username or email address *Required
Password *Required
Note: Entering wrong username in the login form will ban your IP address immediately. Entering wrong password multiple times will also ban your IP address temporarily.
Log in
Lost your password? Remember me
No account yet?